Due to the aging infrastructure of the Capellen site, consisting of around forty buildings, and the growing lack of office space, NSPA was tasked in December 2017 with developing a long-term strategic infrastructure plan.

Four priority criteria guided this study:

  • Occupational health and safety: An audit revealed the need for compliance upgrades to existing buildings.

  • Agency growth: Increased activity led to a shortage of office space, with the site operating beyond its capacity since late 2019.

  • High operating costs: Infrastructure deterioration and energy inefficiencies result in significant maintenance, upkeep, and repair costs.

In June 2019, the first modernization phase was approved, and LSC360 was appointed as technical assistance for the Public Buildings Administration. This phase includes the construction of two new buildings, NEWADMIN1 & 2, designed to accommodate approximately 600 people.

  • Maître d'ouvrage NSPA / Administration des Bâtiment Publics

  • Etude 2017-2027

  • Construction 2020-2032

Caractéristique(s) principale(s)

• Réaménagement entier du site
• Surface du site env. 19 ha
• Démolition de 40+ bâtiments
• Nouveaux bureaux pour +1.500 personnes
• Nouveau centre de conférence
• Nouveau centre logistique
• Nouvelles infrastructures

Nos missions

• Assistance au maître d’ouvrage
• Pilotage du projet
• Procédures d’appel d’offres
• Procédures des soumissions
• Demandes d’autorisation
• Réunions de chantier
• Contrôle métré
• Suivi financier