Archives: References

Structure OA2514 – Marie-Astrid Dock

As part of the renovation of the tourist boat Marie-Astrid, a new floating pontoon was designed and built in Schengen to ensure safe and accessible docking of the vessel. The project included the design and implementation of a floating structure adapted to the hydraulic conditions of the Moselle, incorporating a mooring system on dolphins and … Continued

Structure OA2513 – Docking Platform for the Regional Police and CGDIS Service

Construction of a secant pile retaining wall enabling the creation of a walkable platform forming a docking quay. Boat launching is made possible via two cranes and a slipway, integrated into the project area. A technical room is also present on site to manage electronic equipment while serving as a storage area for materials.

Hydraulic Structure on CR364 in Berdorf

Following the heavy rainfall on June 1st, which led to the partial destruction of the CR364 at the location known as “Predegstull,” a new hydraulic structure was designed. This was achieved using a hydrological model coupled with a 2D simulation of surface flow on the road in case of failure of the structure.

Omnia Tower

Rising 15 stories, the Omnia Tower consists of four subtly offset volumes, creating a dynamic and bold silhouette. Designed by the architectural firm Moreno, the tower captivates with a visual effect suggesting gentle movement and its champagne-colored metal façade, which lends it contemporary elegance. Certified 100% passive, the residence is located in the heart of … Continued

National Museum of Resistance

The project consists of carrying out transformation, extension, and renovation works at the National Museum of Resistance, located at 136, rue de l’Alzette, L-4011 Esch-sur-Alzette.

New Administrative Building Allegra

LSC360 successfully carried out the structural studies for a new administrative building designed using the CREE System: a hybrid timber-concrete modular construction.

New Administrative Building “Allegra”

Allegra is the new headquarters of the company CDCL, located in Leudelange in the Am Bann business park. This innovative building is designed according to the CREE system, a hybrid construction method combining prefabricated concrete and timber elements. The project consists of two offset volumes connected by a vertical circulation core. It includes three underground … Continued

N7 Crossing

The National Road 7, or Noordstrooss, was heavily congested until the opening of the A7 motorway in September 2015. The A7 reduced traffic by around 35% between Rollingen and Lorenzweiler, but the N7 remained dangerous. The Ministry of Sustainable Development and Infrastructure (MDDI) commissioned several studies to develop a project aimed at improving safety through … Continued

Daylighting of the Rombach

At the time of slate mining in Haut-Martelange, the valley of the Rombach stream was filled with slate residues, and from that period onward the stream flowed underground towards Rombach-Martelange. As part of this project, the stream is being brought back to the surface. During the planning phase, the main objective was to simulate the … Continued