Skip to content

Our professions

You are

Your project / Your needs

Contact

Archives: References

Redevelopment of the CR118/CR121 Junction – Reconstruction of OA355 and OA359

The junction is located at the intersection of CR118 and CR121 in Breidweiler, an area with heavy traffic causing slowdowns and accident risks. Replacing the stop-controlled junction with a roundabout aims to improve traffic flow and reduce accidents. The roundabout allows for better traffic distribution, avoiding sudden stops and priority conflicts. At the same time, … Continued

Redevelopment of “Rue Belair” and “Rue Pasteur”

The City of Differdange undertakes annual redevelopment and refurbishment of several streets. In 2021, the main works focused on Rue Pasteur and Rue Belair. Dry networks as well as water and gas pipelines were completely renewed. The combined and stormwater drainage systems were entirely redesigned. Roadways and sidewalks were upgraded and enhanced with permeable green … Continued

Redevelopment of “Place de la Résistance”

The redevelopment of Place de la Résistance, along with the adjacent Rue de l’École and Rue du Centre, completely rethought the use of the space, creating a shared space that allows different users to coexist safely. Amenities have been incorporated to enhance comfort and accessibility: public toilets integrated into the bus stop structure, bicycle parking, … Continued

Alzette District

The Metzeschmelz district involves the rehabilitation of a 63-hectare former steelworks site located between Esch-sur-Alzette and Schifflange, transforming it into a mixed-use urban neighborhood with housing, retail, offices, artisanal spaces, and cultural, social, and public facilities. Eventually, the project will host approximately 10,000 new residents, with a total gross built-up area of around 800,000 m². … Continued

Alzette Promenade

The project enabled the stabilization and enhancement of the Alzette riverbanks over a length of 780 m in Ettelbruck, in collaboration with the engineering firm Eepi. Various techniques were applied, such as the use of regional stone blocks, rockfill, fascines, and groynes to limit erosion. The pedestrian and cycling path was renovated, with new access … Continued

Luxlait WWTP Extension Project

As part of the extension of Luxlait Association Agricole’s wastewater treatment plant (WWTP) and the connection of its discharge point to the Attert River, the Administration of Water Management (AGE) aimed to assess the potential ecological impact on the river’s spawning areas. Our mission included: Identifying spawning zones according to fish species and proposing an … Continued

Police

Construction of a new building to house the police services in Differdange. The project includes administrative areas, operational facilities, and technical installations required for the effective functioning of the police.