Cactus Supermarket
We carried out the construction site safety coordination mission in accordance with the Grand-Ducal Regulation of 27 June 2008.
Contact
We carried out the construction site safety coordination mission in accordance with the Grand-Ducal Regulation of 27 June 2008.
Construction of a shopping center with hypermarket, shopping mall, fitness center, daycare facility and 67 integrated residential units • Participation in design meetings• Preparation and updating of the General Health and Safety Plan (PGSS)• Preparation and updating of the prior notice• Review of the Specific Health and Safety Plans (PPSS)• Regular site visits and participation … Continued
Construction of the Batty Weber site including a nursery, a psychotherapeutic boarding school, a therapeutic and administrative center, shared infrastructures, housing for autistic persons and parents with disabilities (8 buildings). • Participation in design meetings• Preparation and updating of the General Health and Safety Plan (PGSS)• Preparation and updating of the prior notice• Review of … Continued
The building consists of a ground floor and three upper floors. It offers 35 apartments with 1 to 4 bedrooms, ranging from 58 to 138 m²: 7 one-bedroom apartments 9 two-bedroom apartments 8 three-bedroom apartments 11 four-bedroom apartments Nine apartments are reserved for elderly residents, and five are adapted to accommodate persons with reduced mobility. … Continued
The Cemetery 3D application provides a precise and detailed visualization of graves. The use of 3D data replaces traditional photographic documentation, allowing optimal readability of inscriptions and a faithful representation of reality. An information table summarizing essential data is linked to each grave. The SIGcom system is also enriched with a connection to external databases … Continued
Siemens built a combined-cycle gas power plant in Landivisiau (Finistère, France) on behalf of the Compagnie Électrique de Bretagne, a company owned 50 % by Direct Énergie (later Total Energies) and 50 % by Siemens during the development phase. With a capacity of 446 MW and an investment of €450 million, the plant ensures that the Brittany region avoids … Continued
As part of an interdepartmental project, LSC360 was involved in a study aimed at improving the hydromorphological condition of the Clerve River in Enscherange. The Clerve is approximately 49 km long, originating near Huldange and flowing into the Wiltz River at Kautenbach. Along its course, it passes through the communes of Enscherange and Wilwerwiltz, which … Continued
The commune of Vianden is bordered along its entire length by the “L’Our” river. Although the river has a very large catchment area, it experienced a major flood event following the torrential rains of July 2021, causing significant damage in the town center. This event also highlighted the vulnerability of other areas of the commune … Continued
Each Rotonde has a diameter of 52 meters and was built in 1875, originally serving as a roundhouse and workshop for steam locomotives. After the gradual disappearance of these engines following World War II, they were repurposed: Rotonde 1: storage space Rotonde 2: CFL bus repair workshop Classified as national monuments in 1991, the Rotondes … Continued
The “Um Rosswénkel” restaurant is located within LSC360’s new headquarters in Contern. The project includes a four-story office building with open office floors, and two basement levels for parking, technical rooms, and storage. It is designed to provide employees with a high level of well-being. Friendly meeting areas have been arranged between the two wings … Continued