Heintz Van Landewyck

Construction and operation of a new tobacco manufacturing plant with administrative areas: Heintz Van Landewyck Fridhaff

  • Contracting authority Heintz Van Landewyck

  • Etude 2015-2019

  • Construction 2017-2021

Key features

  • Hall with steel structure: 37,000 m²

  • Offices: 5,500 m²

  • Concrete (including precast): 22,000 m³

  • Reinforcement (including precast): 2,300 t

  • Steel frameworks: 1,350 t

  • Span greater than 40 meters

Our missions

  • Project management

  • Study of external development / landscaping

  • Structural design of the building’s load-bearing elements

  • Safety coordination