Dismantling of 60 Pylons Across the Natura 2000 Zone

The dismantling of the 37 kV power line between Schifflange and Dudelange, connecting the former ArcelorMittal plant in Schifflange to the Dudelange substation, took place.

The works were carried out on the Sotel high-voltage line, crossing the municipalities of Esch-sur-Alzette (sections A of Esch-Nord and B of Lallange), Schifflange (section A), Kayl (sections A and B), and Dudelange (sections C and A of Budersberg).

  • Contracting authority Sotel Réseau et Cie

  • Construction 2023-2024

Our missions

  • Participation in project design meetings

  • Preparation and updating of the preliminary notice

  • Preparation and updating of the General Safety and Health Plan (GSHP)

  • Review of Specific Safety and Health Plans (SSHPs)

  • Regular site visits according to critical phases and risk analysis

  • Preparation of the file adapted to the characteristics of the structure (DAO)