At the time of slate mining in Haut-Martelange, the valley of the Rombach stream was filled with slate residues, and from that period onward the stream flowed underground towards Rombach-Martelange. As part of this project, the stream is being brought back to the surface. During the planning phase, the main objective was to simulate the hydraulic conditions the stream will have in its design state. It should be noted that there are areas where the stream runs through forested zones, areas such as those described where the stream is daylighted, and underground sections that had to be analyzed and simulated in order to ensure feasibility.
Contracting authority Administration communale de Rambrouch
Etude 2022-2025
Construction 2026
Key features
Analysis of the quality of excavation materials
Hydraulic flow conditions in relation to additional pumping inflow from the Slate Museum
River length: 600 m
Reference flows: MNQ, MQ, HQ100
Study of material reuse solutions
Our missions
Definition and illustration of the typology
Determination of hydrological, hydraulic, and geotechnical characteristics
Development of the hydraulic simulation program
Simulation and calibration of results
Preparation of the tender and execution phase