Skip to content

Our professions

You are

Your project / Your needs

Contact

Archives: References

Heintz Van Landewyck

Heintz van Landewyck built a new 37,000 m² factory, inaugurated on June 15, 2022, in the “Zano” industrial zone at Fridhaff, between Erpeldange-sur-Sûre and Diekirch. This new facility replaced the two production sites in Luxembourg-Hollerich and Ettelbruck.

Heintz Van Landewyck

Construction and operation of a new tobacco manufacturing plant with administrative areas: Heintz Van Landewyck Fridhaff Facilitation of safety meetings Risk assessment in an industrial environment and implementation of safety measures

Heintz Van Landewyck

Simon-Christiansen & Associés was responsible for the Commodo-Incommodo study of Heintz Van Landewyck, a factory producing tobacco, cigars, and cigarettes.

ZAER Business Area

The Hydrology Department successfully carried out the studies for the retention basin of the ZAER Business Area in Steinfort. The design of the stormwater management project focused on four main aspects: maximizing the use of open-air infrastructures, quantitative and qualitative management of stormwater, landscape development, and the efficient use of earthworks.

Transformation National Museum of the Resistance

The museum, which had been closed since 2018 for renovation works, reopened its doors in March 2024.A first phase involved upgrading the former building constructed in 1956 by Nicolas Schmit-Noesen to bring it up to modern standards. The necessary renovations were carried out, including the refurbishment of floors and lighting, replacement of the skylight and … Continued

Transformation Al Scheier

The barn “Al Scheier”, dating back to 1878 and listed as a historic monument, underwent a restoration project carried out in close consultation with the local community. An information session and a round-table discussion with the architects enabled the exchange of ideas and the integration of residents’ needs from the very beginning of the project.The … Continued

Tram – Sections A and B

Reinforcement and diversion of existing utility networks, as well as roadworks and landscaping around the tram corridor, as part of the construction of the tram line between Luxexpo and Luxembourg Central Station, corresponding to sections A and B. This section of the line extends over a length of approximately 8 km and includes 15 stations.

Tram – Section K2A “Pafendall – Langfuur”

The K2A project is a 2.3 km extension of the tram line in Luxembourg, aimed at improving access to the Kirchberg plateau. It starts at the Rout Bréck – Pafendall station and follows Konrad Adenauer Boulevard, with three new stations planned: Wehrer, European School and Laangfur. This extension will serve key institutions such as the … Continued

Tram – Section K2 “Pafendall – Langfuur – Luxexpo”

The K2 line, scheduled to be commissioned in 2027, will be implemented in two phases. The first phase, consisting of a double-track section, extends over 2.3 km and includes three new stations. It branches off from the existing line near the Rout Bréck-Pafendall station to reach the future mixed-use district “Laangfur”. The integration of the … Continued

Dust Extraction System

After dismantling the dust extraction system from its former plant in Florange (France) piece by piece, ArcelorMittal will reassemble it at the ArcelorMittal Long Products Luxembourg site in Differdange.Connected to industrial extraction hoods positioned as close as possible to the most emission-intensive processes, the system will capture the maximum amount of dust at the source. … Continued