Contact
Renovation works and replacement of the ceiling above the ground floor of Hotel Alfa, located in the train station district of Luxembourg City.
Etude 2020-2022
Construction 2022-2024
Key features
• Deconstruction concept for non-structural building elements
• Determination of relevant material properties from historical construction tables and literature
• Analysis of the load-bearing structure and comparative static calculations, comparing historical standard loads with the new usage (building dating from 1920)
• Development of a demolition concept including temporary bracing
• Static sizing of all construction elements to be reinforced
• Execution planning (temporary structure, bracing structure, and final load-bearing structure)
• Preparation of the tender dossier
• Organization of site visits with contractors
• Participation in coordination and site meetings
• Preparation of acceptance reports for executed works
Our missions
• Deconstruction concept
• Demolition concept
• Structural design
• Detailed preliminary design
• Execution design
• Tender dossier
• Coordination