Participation in project design meetings
Preparation and updating of the preliminary notice
Preparation and updating of the General Safety and Health Plan (GSHP)
Review of Specific Safety and Health Plans (SSHPs)
Regular site visits according to critical phases and risk analysis
Preparation of the file adapted to the characteristics of the structure (DAO)
Contact
The dismantling of the 37 kV power line between Schifflange and Dudelange, connecting the former ArcelorMittal plant in Schifflange to the Dudelange substation, took place.
The works were carried out on the Sotel high-voltage line, crossing the municipalities of Esch-sur-Alzette (sections A of Esch-Nord and B of Lallange), Schifflange (section A), Kayl (sections A and B), and Dudelange (sections C and A of Budersberg).
Contracting authority Sotel Réseau et Cie
Construction 2023-2024