Reinforcement and diversion of existing utility networks, as well as roadworks and landscaping around the tram corridor, as part of the construction of the tram line between Luxexpo and Luxembourg Central Station, corresponding to sections A and B.
This section of the line extends over a length of approximately 8 km and includes 15 stations.
Contracting authority Luxtram (G.I.E.)
Etude 2015-2021
Construction 2016-2021
Key features
Approximately 3,000 m of sewer networks (stormwater and wastewater) to be reinforced or diverted
600 m of medium-voltage networks to be reinforced or diverted
Major diversion or reinforcement works on the following networks: district heating, Creos (low and medium voltage), POST, Eltrona, Cegecom, public lighting, gas (medium and low pressure), fiber optics, potable water