Contact
Construction of a secant pile retaining wall enabling the creation of a walkable platform forming a docking quay. Boat launching is made possible via two cranes and a slipway, integrated into the project area. A technical room is also present on site to manage electronic equipment while serving as a storage area for materials.
Contracting authority Administration des ponts et chaussées -Division des Ouvrages d’Art / Service Entretien-Navigation
Etude 2019-2023
Construction 2023-2025