We were involved from the preliminary design phase (APS) to the execution phase (EXE) in close collaboration with our partners in the consortium: Decker-Lammar & Associates and IBB. The building mainly consists of a gymnasium with 32 m long LC timber beams, a dance hall, changing rooms, and refreshment areas.
Contracting authority Administration communale de Differdange
Etude 2017 – 2019
Construction 2018 – 2019
Key features
• Shallow foundations on soil replacement – close collaboration with the geotechnical engineering office for the proposal of alternatives
• 8 m cantilever of the dance hall over the gymnasium to ensure fire-resistance independence
Our missions
• Structural definition and design
• Preliminary design study, section sizing, and load analysis
• Stability and material strength calculations
• Execution drawings (formwork and reinforcements)
• Reception of reinforcements on site
• Participation in site meetings