• Project developed in partnership with the architectural firm Metaform
• Consideration of the steeply sloped site topography (geotechnical study conducted additionally)
• Planning of three single-family houses
• Evaluation Cell opinion: 14/10/2013
• Ministerial approval: 19/06/2014