Pushing Works 1 + 2

Execution of the site safety and health coordination mission in accordance with the Grand-Ducal regulation of 27 June 2008.
The project concerned the connection of the city of Dudelange and the industrial area to the Bettembourg wastewater treatment plant (WWTP) network.

  • Contracting authority Administration Communale de Bettembourg

  • Etude 2019-2021

  • Construction 2022-2024

Key features

• Boring of 1.2 km in length and 1.4 km in width, at a depth of 4 m, for the installation of a pipeline network bypass

• Presence of risks related to site operations (possibility of bombs/mines and gas pipelines)

• Work carried out near high-voltage overhead and underground lines

Our missions

• Participation in project design meetings

• Preparation and updating of the preliminary notice

• Preparation and updating of the General Safety and Health Plan (PGSS)

• Verification of the Particular Safety and Health Plans (PPSS)

• Regular site visits according to critical phases and risk analysis

• Preparation of the dossier adapted to the structure (DAO)

SHARE