• Boring of 1.2 km in length and 1.4 km in width, at a depth of 4 m, for the installation of a pipeline network bypass
• Presence of risks related to site operations (possibility of bombs/mines and gas pipelines)
• Work carried out near high-voltage overhead and underground lines