Photovoltaic Panels for the « John Zink » Site

Installation of carports with photovoltaic panels on the employee and visitor parking at the John Zink site in Dudelange. Execution of the site safety coordination mission in accordance with the Grand-Ducal regulation of 27 June 2008.

  • Contracting authority Enovos Luxembourg

  • Etude 2023

  • Construction 2023

Key features

• Installation of photovoltaic panels of 953.8 kWp

• Work on an operational industrial site

Our missions

• Participation in design meetings and site meetings

• Preparation and updating of the General Safety and Health Plan (PGSS)

• Preparation and adaptation of the preliminary notice

• Coordination meetings

• Verification of the Particular Safety and Health Plans (PPSS)

• Regular site visits with visit reports

• Preparation of the dossier adapted to the characteristics of the structure (DAO)