Skip to content

Our professions

You are

Your project / Your needs

Contact

Photovoltaic Panels for Creos

Installation of carports with photovoltaic panels in the employee parking lot at Creos’ main site in Roost. Execution of the site safety coordination mission in accordance with the Grand-Ducal regulation of 27 June 2008.

  • Contracting authority Enovos Luxembourg S.A.

  • Etude 2023

  • Construction 2023

Key features

• Installation of photovoltaic panels of 469.5 kWp

• Work near high-voltage overhead lines

Our missions

• Participation in design meetings and site meetings

• Preparation and updating of the General Safety and Health Plan (PGSS)

• Preparation and adaptation of the preliminary notice

• Coordination meetings

• Verification of the Particular Safety and Health Plans (PPSS)

• Regular site visits with visit reports

• Preparation of the dossier adapted to the characteristics of the structure (DAO)

SHARE