Wildlife Crossing – A3 Motorway
Construction of a wildlife crossing structure as part of the widening of the A3 motorway to 2 x 3 lanes.
Contact
Construction of a wildlife crossing structure as part of the widening of the A3 motorway to 2 x 3 lanes.
Gasperich Park, the largest municipal park in Luxembourg, covers nearly 15 hectares along boulevard Kockelscheuer, opposite the National Fire and Rescue Center. As the city’s green lung, it offers recreation and entertainment while emphasizing biodiversity conservation. The Drosbach River has been renaturalized along 810 m, with wetland areas and a floodplain forest, complemented by a … Continued
Installation of carports with photovoltaic panels on the employee and visitor parking at the John Zink site in Dudelange. Execution of the site safety coordination mission in accordance with the Grand-Ducal regulation of 27 June 2008.
Installation of photovoltaic panels on the roof of the Heintz Van Landewyck factory in Fridhaff.
Installation of carports with photovoltaic panels in the employee parking lot at Creos’ main site in Roost. Execution of the site safety coordination mission in accordance with the Grand-Ducal regulation of 27 June 2008.
Installation of carports with photovoltaic panels in the employee parking lot at Creos’ main site in Roost. We carried out the safety coordination mission on-site in accordance with the Grand-Ducal regulation of 27 June 2008.
Located near the Esch-Micheville link, the OA865 cycle bridge allows crossing over the Rue du Crassier, leading to the future Ehlerange zoning area. It spans a clear distance of 35 m with a width of 3.44 m – crossing a four-lane road with separated traffic lanes, a shared pedestrian and bicycle path, and a gutter … Continued