Pushing Works 1 + 2

Execution of the site safety and health coordination mission in accordance with the Grand-Ducal regulation of 27 June 2008.The project concerned the connection of the city of Dudelange and the industrial area to the Bettembourg wastewater treatment plant (WWTP) network.

Swimming Pool Extension

The extension of the inter-municipal school swimming pool doubled the facility’s capacity by adding a second learning pool, identical to the first, measuring 25 m x 12.5 m, with 5 swimming lanes. The new building is organized over two levels — a basement and a ground floor — both perfectly aligned with the levels of … Continued

Extension of the Maison-Relais and Preschool

A three-story extension was built on the existing two-story building of the Gonderange school, and renovation works were carried out on the existing lower levels. The works were carried out largely without interrupting school activities. A wing in mixed construction, reinforced concrete and wood, was erected on the south gable of the existing building. As … Continued

Implementation of the “Faïencerie” Detailed Development Plan

The “Faïencerie” project aims to redevelop the former Villeroy & Boch faience site in Rollingergrund, Luxembourg, which is currently derelict. Covering 8.5 hectares, the site is now integrated into the urban fabric of the City of Luxembourg. The objective is to develop a mixed-use district with over 809 housing units, commercial, office, and service areas. … Continued

Environmental Impact Assessment (EIA) for a Cogeneration Plant

In accordance with the decision of the Salzburg regional government, the project designated as “Cogeneration Plant (KWK-Anlage)” falls under Article 2, lit. c) of Annex 1 of the Environmental Impact Assessment Act (UVP-G 2000). It is therefore subject to an Environmental Impact Assessment (EIA) under Article 3, paragraph 1. For this purpose, LSC360 was commissioned … Continued

Hydraulic Study of the Drinking Water Network

We conducted a hydraulic study of the drinking water network of the municipality of Bissen. This study is based on an in-situ measurement campaign and the use of a numerical model allowing the simulation of different scenarios and improvement measures.

Simplified Study of Heavy Rainfall for the PAP “Kiem”

The municipality of Strassen commissioned, within the framework of the PAP “Kiem” in Strassen, a hydraulic modeling of surface flow conditions to determine the extent to which the planned construction projects influence runoff characteristics and potentially modified flood zones.

Initial Ecological Status of the Clerve Before Works

The Water Management Administration wished to assess the potential ecological impact of the improvement of sanitation infrastructure (WWTP, stormwater basins) on the receiving aquatic environments. Our mission was to define an evaluation protocol using the available tools: physico-chemical monitoring of water during rain and dry periods, biological indices in watercourses with selected bio-indicators: diatom algae, … Continued