Luxembourg Freeport

Construction of a highly secure logistics hub for the storage of goods and valuables, under optimal conservation and preservation conditions.

  • Contracting authority Natural Le Coultre

  • Etude 2012-2014

  • Construction 2012-2014

Key features

  • Concrete: 16,400 m³

  • One large post-tensioned wall-beam, 59 m long with a variable height of 10–13.80 m (clear span 43 m)

  • Formwork: 47,400 m²

  • Reinforcement steel: 1,700 t

  • Earthworks: 38,000 m³

  • Masonry: 10,000 m²

Our missions

  • Preliminary design

  • Detailed design

  • Structural calculations

  • Execution drawings (formwork, reinforcement, and overall steel structure plans)

  • Construction meetings

  • On-site work supervision

  • Studies of exterior developments

  • Safety and health coordination

  • Evacuation plans