Implementation of the “Faïencerie” Detailed Development Plan

Road construction & various networks

The “Faïencerie” project aims to redevelop the former Villeroy & Boch faience site in Rollingergrund, Luxembourg, which is currently derelict. Covering 8.5 hectares, the site is now integrated into the urban fabric of the City of Luxembourg. The objective is to develop a mixed-use district with over 809 housing units, commercial, office, and service areas.

The transfer to the municipal public domain amounts to approximately 32%. The project is the result of close collaboration with the City of Luxembourg and its services. It is a complex project involving numerous technical challenges.

As well as a significant coordination component:
• Coordination with numerous stakeholders: project owner, City of Luxembourg (road services, pipelines, drinking water, mobility, …), Administration of Public Works…
• Coordination of the technical team composed of hydrologists, road engineers, and landscape architects

  • Contracting authority Rollingergrund Premium Properties – Villeroy&Boch

  • Etude 2020-2025

  • Construction Phase 1 : 2026–2029 / Phase 2 : à définir

Key features

  • Earthworks: 40,600 m³

  • Sewer / stormwater / heating pipes: 2,450 m

  • Drinking water pipes: 1,400 m

  • Dry utility networks (Post – Eltrona – lighting – ICT): 7,500 m

  • Dry utility networks Creos (low and medium voltage): 2,700 m

  • Reinforced concrete structures: 1,350 m³ of concrete

  • Total volume of retention basins (open-air and underground): 1,180 m³

  • Regional basin: 1,745 m³

Our missions

  • Phase 1 and 2 studies

    • Preliminary design

    • Detailed design

    • Execution dossier

    • Coordination meetings

  • Requests for information and authorizations, phases 1 and 2

    • Water law authorization request

    • Road permit request

    • Building permit request

    • Commodo file for contaminated soils

  • Structure studies for phases 1 and 2

  • Studies for the stability of the existing chimney

  • Studies for the demolition of slabs in phase 1