Roads: 300 m and sidewalks: 500 m
Trench excavation / earthworks: 14,000 m³
Asphalt: 2,700 m², paving stones: 2,500 m²
Drainage: 250 m of concrete stormwater pipes and 350 m of clay sewer pipes
Utilities: water supply, gas pipeline, district heating, telecommunications, low-voltage and medium-voltage networks, collective antenna, fiber optic, signage, public lighting
Contact
Comprehensive modification of the infrastructures of Avenue Monterey, Avenue Emile Reuter, Grand-Rue, and Rue Aldringen to facilitate the construction of access tunnels to the parking facility. Coordination of studies with all stakeholders. Clearance of networks along the Avenue Emile Reuter corridor in the framework of the future tram project.
Contracting authority CODIC International
Etude 2011-2014
Construction 2015-2020