Skip to content

Our professions

You are

Your project / Your needs

Contact

Cactus Supermarket

We carried out the construction site safety coordination mission in accordance with the Grand-Ducal Regulation of 27 June 2008.

  • Contracting authority Immobilière Roodt-Syre S.A.

  • Etude 2019-2020

  • Construction 2020-2022

Our missions

  • Participation in design meetings

  • Preparation and updating of the general safety and health plan (GSHP)

  • Preparation and updating of the preliminary notice

  • Verification of specific safety and health plans (SSHPs)

  • Regular site visits and attendance at construction meetings according to critical phases and risk analysis

  • Preparation of a file adapted to the characteristics of the structure (DAO)

SHARE