Contracting authority Public Buildings Administration
Etude 2013–2019
Construction 2019–2021
Key features
– General earthworks
– Separate drainage system and track gutter (400 m)
– Drinking water supply and utility networks: electricity and timing systems
– Refurbishment of the synthetic sports surface and underlay (7,500 m²)
– Landscaping of the surrounding area (1,100 m² of asphalt path – 570 m² of concrete paving)
– Clad handrails and gates (380 m), external fencing and gate (125 m)
– Fixed, built-in sports equipment (hurdle pit, throwing areas, jumping areas, goals)
Our missions
– Preliminary design with a rough estimate of the construction costs
– Final design with a detailed cost estimate
– Requests for information and planning permission
– Quantity surveying, tender documents and cost estimates
– Construction drawings
– Special supervision of the works