Construction of a new drinking water reservoir with three stainless steel tanks, totaling 870 m³, housed in a timber hall.
This reservoir replaces the old one in the municipality of Heffingen, which no longer met current standards and had insufficient storage capacity. The new reservoir supplies the village of Heffingen by gravity and the village of Reuland via a hydrophore system. The hall consists of a basement with a valve chamber and reinforced concrete foundation, topped with a timber structure, enclosed with insulated sandwich panels and wooden cladding. The stainless steel tanks, equipped with integrated cleaning systems, were welded on site.
Stainless steel piping and the hydrophore ensuring pressure supply to the village of Reuland are installed inside the reservoir. The system is connected to the municipality’s remote monitoring system for 24/7 surveillance.
Contracting authority Administration communale de Heffingen
Etude 2017-2020
Construction 2020-2022
Key features
Stainless steel reservoir (3 tanks) in a timber hall
Hydrophore with variable frequency drive
Piping in stainless steel 316 Ti
Remote monitoring of the facility
Our missions
Authorization applications
Preliminary design
Detailed design
Site meetings
Feasibility studies
Execution drawings
Retention calculations
Mass calculations
Quantity surveying
Financial monitoring