Contact
Contracting authority Administration communale de Mamer
Etude 2019-2020
Construction 2021-2023
Key features
• Redevelopment of Place de la Résistance and surrounding streets: Rue de l’École and Rue du Centre
• Implementation of a Shared Space in the village center to make it more attractive, including:
Renewal and reorganization of surfaces
Renovation of the existing Résistance monument and enhancement of its location
Development of a bus stop including public toilets and bicycle parking with a bike box
Reorganization of the existing parking area with creation of permeable surfaces, spaces reserved for electric and shared cars (Flex)
New church access adapted for people with reduced mobility (ramp, elevator)
Development of a pétanque court
Planting in movable planters to allow flexible reshaping and reorganization of the space according to user needs
Various equipment including: digital information board, Wi-Fi terminals, defibrillator
Renewal of existing infrastructure: wastewater, stormwater, potable water pipelines, reinforcement of electrical, telecommunications, and collective antenna networks
Renewal of street lighting with integration of an intelligent management system
Our missions
• Topographical survey of the site
• Studies for the entire project
• Roadway permit application
• AGE authorization request
• Grant applications and their settlement
• Tender dossier
• General project and construction management
• Special inspection and site supervision
• Coordination mission for safety and health on site
• Design and calculation of exterior lighting