• PAP area: 3 ha 25 a 04 ca
• Earthworks volume: 8,000 m³
• Roads: 3,800 m²
• Number of dwellings: 49 family houses and 32 apartments
• Number of retention basins: 2 open-air basins of 65 and 27 m³; 2 underground basins of 124 and 56 m³
• Retaining structures along paths, parking, and basin: 130 m for 5 structures
• Dry networks:
Electrical: 4,800 m of ducts
Distribution and connection cabinets: 17
Electrical substation: 1
Street lighting: 1,200 m of ducts + stair handrails
Post: 2,700 m of ducts, 9 inspection chambers
Eltrona: 2,900 m of ducts, 8 inspection chambers, 7 cabinets, 1 amplifier
• Sanitation and potable water:Potable water: 720 m dn100
Stormwater: 1,150 m of various diameters
Wastewater: 940 m of various diameters
Basin regulation structures