Wildlife Crossing – A3 Motorway

Road construction & various networks

Construction of a wildlife crossing structure as part of the widening of the A3 motorway to 2 x 3 lanes.

  • Contracting authority Ministère de la Mobilité et des Travaux Publics / Administration des Ponts & Chaussées

  • Etude 2017-2022

  • Construction 2022-2025

Key features

• Excavation: approx. 19,500 m³

• Embankment: approx. 22,000 m³

• Stripping/replacement of topsoil: approx. 10,000 / 6,500 m²

• Symmetrical reinforced concrete barriers: approx. 1,000 m

• Formwork quantity: approx. 5,200 m²

• Concrete quantity: approx. 3,600 m³

• Reinforcement steel: approx. 610,000 kg

Our missions

• Topographical surveys

• Technical assistance

• Construction management in association with Schroeder & Associés