• Participation in design meetings and site meetings
• Preparation and updating of the General Safety and Health Plan (PGSS)
• Preparation and adaptation of the preliminary notice
• Coordination meetings
• Verification of the Particular Safety and Health Plans (PPSS)
• Regular site visits with visit reports
• Preparation of the dossier adapted to the characteristics of the structure (DAO)