Construction of a highly secure logistics hub for the storage of goods and valuables, under optimal conservation and preservation conditions.
Contracting authority Natural Le Coultre
Etude 2012-2014
Construction 2012-2014
Key features
Concrete: 16,400 m³
One large post-tensioned wall-beam, 59 m long with a variable height of 10–13.80 m (clear span 43 m)
Formwork: 47,400 m²
Reinforcement steel: 1,700 t
Earthworks: 38,000 m³
Masonry: 10,000 m²
Our missions
Preliminary design
Detailed design
Structural calculations
Execution drawings (formwork, reinforcement, and overall steel structure plans)
Construction meetings
On-site work supervision
Studies of exterior developments
Safety and health coordination
Evacuation plans