The PAP “An der Schmëtt” in Wecker is located in the municipality of Biwer. It covers an area of 5.5 ha and plans for 164 housing units with a mix of typologies:
single-family houses, multi-family houses, and apartment buildings, resulting in a density of approximately 25 housing units per gross hectare. The transfer to the communal public domain amounts to approximately 37%, allowing for open-air stormwater retention and the renaturation of the Syre River.
In addition to services directly linked to execution, our office implemented innovative solutions to meet the expectations of the client, including:
• 3D modeling to optimally reprofile the land,
• implementation of the open-air sanitation concept as defined in the PAP,
• optimization of lighting to reduce light pollution,
• geotechnical assistance for lime treatment of site excavated material to prepare private land for direct construction.
Through this project, our team was able to demonstrate its ability to:
• understand the requirements and expectations of the client in terms of planning and execution,
• work in close collaboration with the various stakeholders involved in a complex and large-scale project.
Contracting authority Fonds du Logement / SIDEST
Etude 2020-2021
Construction 2022-2023 (Phase 1) / 2027-2028 (Phase 2)
Key features
Earthworks: 30,000 m³
Sewer / stormwater pipes: 3,000 m
Drinking water pipes: 2,320 m
Dry utility networks (Post – Eltrona – lighting): 3,550 m
Dry utility networks Creos (low + medium voltage): 9,800 m
Road surfaces:
Paved area: 3,650 m²
Asphalted area: 5,500 m²
Permeable paved area: 800 m²
Total volume of retention basins (open-air and underground): 670 m³
Stormwater discharge entirely open via granite-paved channels (widths 0.70 m to 1.60 m): 1,400 m
Lime treatment of excavated soils and their reuse: 13,250 m³
Pedestrian steel bridge, 80 m long in 6 spans, usable width 1.5 m
Rehabilitation of a reinforced concrete road bridge over the Syre for restoration and safety: deck 25 m × 9.7 m
Our missions
Preliminary, tender, and execution studies
Landscape design and playground areas
Lighting optimization study to reduce light pollution
Stability study of an existing bridge and its restoration
Study of a pedestrian bridge over the watercourse
Geotechnical assistance for lime treatment of site excavated soils
Authorization requests with MECDD, AGE, and P&CH
Construction supervision and financial monitoring