Demolition, renovation, extension, and construction of the “Um Bock” school, as well as exterior landscaping.
The size of the existing school was doubled, and that of the sports hall was tripled.
Contracting authority Administration Communale de Differdange
Etude 2018-2023
Construction 2021-2023
Key features
Concrete: 4,778 m³
Steel: 558 t
Offices, meeting room, training rooms, 22 classrooms, restrooms, sports hall, outdoor sports fields
3 levels
Interior staircase, walkway, corridors, district heating
Our missions
Preliminary and detailed design studies
Structural analysis / static studies
Tender documents
Estimated and detailed cost estimates
Quantity survey control
Execution drawings
Construction supervision and reinforcement inspection