Construction of a Photovoltaic Installation Mineco – LoopPark

Safety and health coordination mission on site, in accordance with the Grand-Ducal regulation of June 27, 2008.
Construction of a rooftop photovoltaic installation on the “LoopPark” open-air parking, with a capacity of 392.70 kWp.

  • Contracting authority Enovos Luxembourg

  • Etude 2023-2024

  • Construction 2024

Key features

  • Installed capacity of 392.70 kWp

  • Installation on a flat roof with a risk of working at height

  • Low-voltage connection (400 V)

  • Construction site adjacent to the parking facility currently under completion

Our missions

  • Participation in project design meetings

  • Preparation and updating of the preliminary notice

  • Preparation and updating of the General Safety and Health Plan (GSHP)

  • Review of Specific Safety and Health Plans (SSHPs)

  • Regular site visits based on critical phases and risk analysis

  • Preparation of the file adapted to the characteristics of the structure (DAO)