The project involved the installation of a photovoltaic system on the site located next to the two recently completed halls. The halls included a chicken coop for laying hens and a warehouse.
The works took place on Rue de la Croix, L-4998 Sprinkange.
Contracting authority Enovos Luxembourg
Construction 2024
Key features
Installation of 3,524 kWp photovoltaic panels
Our missions
Participation in project design meetings
Preparation and updating of the preliminary notice
Preparation and updating of the General Safety and Health Plan (GSHP)
Review of Specific Safety and Health Plans (SSHPs)
Regular site visits in line with critical phases and risk analysis
Preparation of the file adapted to the characteristics of the structure (DAO)