Bypass roundabout “Serra”

Natural environment

Impact study for the construction of a bypass for the “Serra” roundabout

  • Contracting authority Administration des Ponts et Chaussées

  • Etude 2007 – 2014

  • Construction 2013 – 2016

Key features

Construction cost:

  • Roads: €5.9 million

  • Structures: €7.9 million

  • Project studies: €490,000

  • Environmental permitting studies: €30,000

Our missions

  • Preliminary and execution design of a bypass from the roundabout to the A1 motorway westbound (1 km), including 400 m in tunnel form

  • EIA and authorization request according to the amended Law of 19 January 2004 on Nature and Natural Resource Protection

  • EIA for Natura 2000 zone

  • Biotope mapping and assessment

  • Design of compensatory measures program and ecological balance

  • Ecological monitoring of the construction site